image
image
Emeraude v2.60 – Doc v2.60.01 - © KAPPA 1988-2010
Guided Interpretation #4
B04 - 6/14
Also, note that all other interpretations inside this document have been carried out in the exact
same manner:
1.
Set/Reset All Zones with 3-Phase L-G (Dukler + ABB-Deviated).
2.
Zone 3, change to Water-Hydrocarbon, Check ADF, Disallow Yw, Improve.
3.
Zone 4, Set Vm = 0, clicking on the ‘No Flow’ button.
Fig B04.8 • Schematic logs
B04.3 • S.I.P.
Move to the ‘Special’ page and select SIP. The following IPR options are given:
Straight line, Fetkovitch, LIT relations.
Surface/reservoir conditions.
P or m(p) for gas production.
Composite IPR (sum of all zones).
Fig B04.9 • S.I.P