image
Emeraude v2.60 – Doc v2.60.01 - © KAPPA 1988-2010
Guided Interpretation #2
B02 - 4/22
B02.2
1B
• Loading the log data
The well was logged twice, once during production and once during the shut-in. All log data are
contained in a single LIS file with 12 logical files, as follows, Files 1-6 = Production; Files 7-12
= Shut-in.
Pass numbers do not matter as long as there is no conflict. Numbers above comply with the
usual convention, ordering passes by increasing cable speed. The provided LIS file does not
define the pass type in the usual LIS field, therefore both pass type and index in the type have
to be defined manually.
Go to the ‘Survey’ panel.
Click on the ‘Create a new Survey’ icon
in front of the drop list survey of the main
toolbar.
Change the dialog values to read: Name:
Production #1
; Short name:
P1
.
Click OK to confirm.
Select ‘Load’ and in the Load dialog ‘Add’ the file B02plt.lis.
Scroll down in the logical file list to see the line for file 7.
Click on the line header button to make it active and select ‘Remove’.
Do the same for files 8,9,10,11,12.
Edit the pass type and pass number for compliance with the above list.
File index
Survey
Pass type
Pass number
1
Production
Down
1
2
Production
Up
1
3
Production
Down
2
4
Production
Up
2
5
Production
Down
3
6
Production
Up
3
7
Shut-in
Down
1
8
Shut-in
Up
1
9
Shut-in
Down
2
10
Shut-in
Up
2
11
Shut-in
Down
3
12
Shut-in
Up
4